Report summary
The A-4/A-5 existing energy auctions (LEEs) held on 25 June 2021 were intended to re-contract most of the country's existing thermal fleet, but only a single power plant was awarded. Essentially, the existing auction mechanism had relied on local distribution companies' (LDCs) demand declarations, which have been declining over time. Conscious of the mechanism's limitations and leveraging the opportunity provided by the current drought, authorities structured a new framework to provide long-term contracts to thermal power plants. The new capacity framework will debut in an auction scheduled for 21 December.
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Asset Report
Colquiri zinc mine
A detailed production and cost competitive analysis of the Colquiri zinc mine.
$2,250
Asset Report
Molejon (Closed) gold mine
A detailed analysis of the Molejon gold mine.
$2,250
Asset Report
Cristalino copper mine project
A review of early works at Cristalino copper project prior to its integration with Sossego.
$2,250