Wood Mackenzie Asia Refining and Chemicals Forum 2016
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- No table of contents specified
Tables and charts
No table or charts specified
What's included
This report contains:
Other reports you may be interested in
Contrasting Futures: Japan vs South Korea in Refining and Chemicals
Parallel challenges, divergent outcomes — the strategies shaping Japan and South Korea refining and chemical sectors
$900Lala (Liangshan) copper mine
A detailed analysis of the Lala (Liangshan) copper mine.
$2,250West East Gas Pipeline III
West-East Pipeline III (WEP III) is connected to line C of the Central Asia-China Gas Pipeline.
$2,580