2023 guidance: upstream companies' capital budgets and production targets
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- 2023 vs 2022: upstream capital budgets
-
2023 vs 2022: production guidance
- Exchange rate assumptions
Tables and charts
This report includes the following images and tables:
-
2023 vs 2022: upstream capital budget evolution by peer group2023 vs 2022: % change in upstream capital budgets by peer group2023 vs 2022: change in production guidance by peer groupExchange rate assumptions (local currency unit per US$)
What's included
This report contains:
Other reports you may be interested in
Rose - Lithium mine project
A detailed analysis of the Rose lithium mineral project.
$2,250Finniss - Lithium mine project
A detailed analysis of the Finniss lithium mineral project.
$2,250Iyad Contract Area (Block 4)
Block 4 (Iyad) is in the Marib-Shabwa basin, south-east of the prolific Marib-Jawf and Jannah fields. Iyad consists of three small ...
$3,720