Asset Report

Aguada de la Arena

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Aguada de la Arena block is located in the wet gas window of the Vaca Muerta shale, adjacent to Sierra Chata (operated by Pampa Energía), Aguada Pichana Este (operated by Total), La Calera (operated by Pluspetrol) and Bajada de Añelo (operated by Shell) projects.YPF operates the block since 2016. Between 2017 and 2019, the operator carried out a pilot programme to test shale potential. Despite achieving attractive well productivities, YPF postponed asset development given ...

Table of contents

Tables and charts

This report includes 22 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Detail Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Sales contracts: Table 1
  • Sales contracts: Table 2
  • Economic analysis: Table 1
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities

What's included

This report contains:

  • Document

    Aguada de la Arena

    PDF 6.26 MB