Asset Report

Alba

Get this report*

$5,280

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Alba heavy oil field lies in the UK Central North Sea, 200-kilometres northeast of Aberdeen. Alba's shallow reservoirs lie above the Britannia gas field. It was discovered in 1984 and brought onstream in 1994.Phase 1 comprised a single steel platform and a floating storage unit (FSU) on the northern part of the field. In phase 2, the southern area was accessed via a subsea tie-back to the main platform. Phase 2 included a major upgrade of the Alba platform and facilities and the ...

Table of contents

  • Summary
    • Infill drilling campaign stalls
    • Imminent COP means Fotla tie-back now unlikely
    • Alba North Platform (ANP)
    • Floating storage unit (FSU)
    • Alba Extreme South (AXS)
    • Alba Extreme South II (AXS II)
    • Production challenges
  • Capital costs
  • Decommissioning costs
  • Operating costs
  • Cash flow
  • Global Economic Model (GEM) file
  • Cash Flow
  • Cash flow (US$ million)
  • Cash flow (£ million)

Tables and charts

This report includes the following images and tables:

    Capital Costs Pre-2018 to 2024 (£ million)Capital Costs 2027 to 2034 (£ million)Operating Costs 2017 to 2026 (£ million)
    Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of RevenuesCumulative Net Cash Flow - UndiscountedCumulative Net Cash Flow - Discounted at 10% from 01/01/2026Remaining Present Value Price SensitivitiesCash Flow (Local Currency)PV Table (Local Currency)
  • 10 more item(s)...

What's included

This report contains:

  • Document

    Alba

    XLS 896.50 KB

  • Document

    Alba

    PDF 2.86 MB