The Andrew Area includes the Andrew, Arundel, Cyrus, Farragon and Kinnoull fields. Andrew was developed using a single fixed platform, which acts as a host for the four other fields. The platform is located 24 kilometres east of the Britannia field.Andrew started production in 1994, followed by Cyrus in 1990 and Farragon in 2005. The three fields were shut in in mid-2011 for brownfield modifications to the Andrew platform to enable further tie-backs. The fields did not restart production ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Potential Lower Cretaceous development
- Kinnoull and Arundel declines
- Andrew Area opex share sensitivities
- Location maps
- Participation
- Geology
- Well data
-
Exploration
- 2000 - to date
- 1970s - 2000
-
Reserves and resources
- Sub Commercial resources
- Production
-
Development
- Wells
- Platform
- Andrew
- Kinnoull
- Farragon and Arundel
- Infrastructure
-
Costs
-
Capital costs
- Andrew
- Arundel
- Cyrus
- Farragon
- Kinnoull
-
Decommissioning costs
- Andrew Area
-
Operating costs
- Emissions Trading Scheme (ETS)
-
Capital costs
- Sales contracts
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Carbon price
- Fiscal terms
- Global Economic Model (GEM) File
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 31 images and tables including:
- Key facts: Table 1
- Index map
- Andrew map
- Participation: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Andrew Area production profile
- Infrastructure: Table 1
- Sales contracts: Table 1
- Reserves and resources: Table 2
- Development: Table 1
- Cash Flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Present Value Price Sensitivities
- Cash Flow (£ million)
- Economic analysis: Table 5
- Economic analysis: Table 6
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Costs: Table 5
- Costs: Table 6
- Costs: Table 7
- Costs: Table 8
What's included
This report contains:
Other reports you may be interested in
Asset Report
Olza zinc mine project
A detailed analysis of the Olza zinc mine project
$2,250
Asset Report
Blaiken (Closed) zinc mine
A detailed analysis of the Blaiken zinc mine.
$2,250
Asset Report
Al Uqlah (Block S2)
The Al Uqlah Block (S2) is located in the Marib-Shabwa Basin, central Yemen, to the east of state-owned SAFER E&P's prolific ...
$3,100