Åsgard
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
-
Summary
- Midgard Subsea Compression
- Smørbukk Sør Extension
-
Key Issues
- Low Pressure Production (phase 3) project to be fully onstream in 2025
- Subsea Compression phase II to start-up in 2025
- Åsgard facilities face high late-life operating costs
- Infill drilling
- Development of Smørbukk Nord
- Blåbjørn onstream in 2023
- Smørbukk Midt prospect
- Infrastructure life extension
- 2 more item(s)...
-
Unitisation
- Historical licensing and corporate activity
- Midgard
- Smørbukk
- Smørbukk Sør
- Smørbukk Nord
- Blåbjørn
- Exploration in the surrounding area
-
Historical exploration
- Midgard
- Smørbukk
- Smørbukk Sør and Blåbjørn
- Smørbukk Nord
- Midgard
- Smørbukk
- 21 more item(s)...
Tables and charts
This report includes the following images and tables:
-
ParticipationField CharacteristicsField Hydrocarbon Characteristics
-
MidgardSmørbukkSmørbukk SørSmørbukk NordReserves (2P) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs 2022 to 2024 (NKr million)Capital Costs 2023 to 2025 (NKr million)
- 19 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Gassled-Åsgard Transportation System
The Åsgard Transportation System (ÅTS) is a gas trunkline from the Haltenbanken fields to the processing terminal at Kårstø.
$2,580Berling
Berling is a HP/HT gas and condensate field, located in the Norwegian Sea. It is being developed as a subsea tie-back to Asgard.
$3,720Mikkel
The Mikkel gas/condensate field is located between the Draugen and Åsgard developments in Mid Norway.
$3,720