Key Issues
- Low Pressure Production (phase 3) project to be fully onstream in 2025
- Subsea Compression phase II to start-up in 2025
- Åsgard facilities face high late-life operating costs
- Infill drilling
- Development of Smørbukk Nord
- Blåbjørn onstream in 2023
- Smørbukk Midt prospect
- Infrastructure life extension
- 2 more item(s)...
-
Unitisation
- Historical licensing and corporate activity
- Midgard
- Smørbukk
- Smørbukk Sør
- Smørbukk Nord
- Blåbjørn
- Exploration in the surrounding area
-
Historical exploration
- Midgard
- Smørbukk
- Smørbukk Sør and Blåbjørn
- Smørbukk Nord
- Midgard
- Smørbukk
- 21 more item(s)...
Tables and charts
This report includes the following images and tables:
- Participation
- Field Characteristics
- Field Hydrocarbon Characteristics
- Midgard
- Smørbukk
- Smørbukk Sør
- Smørbukk Nord
- Reserves (2P) at 01/01/2025
- Production (2015-2024)
- Production Profile
- Capital Costs 2022 to 2024 (NKr million)
- Capital Costs 2023 to 2025 (NKr million)
- 19 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Mikkel
The Mikkel gas/condensate field is located between the Draugen and Åsgard developments in Mid Norway.
$3,720Haltenbanken Vest Unit
The pressure and temperature in the Kristin reservoir are higher than any other field developed to date in Norway.
$3,720Haltenbanken East
Haltenbanken East is the name for the development of six gas and condensate discoveries in the Åsgard area in the Norwegian Sea. ...
$3,720