The Babbage gas field was developed using a not-normally-manned (NNM) platform, tied back via the West Sole infrastructure 28 kilometres to the south. It was developed in two phases using five horizontal platform wells. Gas from Babbage is transported via West Sole to the Dimlington terminal facilities. Production started in 2010 and the field is now mature and expected to cease by the end of the decade.

Table of contents

  • Summary
    • No further investment expected
    • Potential host for nearby discoveries/prospects
    • NEO Energy and Repsol Resource UK in strategic merger
    • Wells
    • Platform
    • Subsea
  • Capital costs
  • Decommissioning costs
  • Operating costs
  • Cash flow
  • Global Economic Model (GEM) file
  • Cash Flow
  • Cash flow (US$ million)
  • Cash flow (£ million)

Tables and charts

This report includes the following images and tables:

  • Capital Costs 2008 to 2013 (£ million)
  • Capital Costs 2031 to 2032 (£ million)
  • Operating Costs 2025 to 2030 (£ million)
  • Cash Flow (US$)
  • PV Table (US$)
  • Summary Table (US$)
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2026
  • Remaining PV Price Sensitivities
  • Cash Flow (Local Currency)
  • PV Table (Local Currency)
  • 11 more item(s)...

What's included

This report contains:

  • Document

    Babbage

    XLS 932.50 KB

  • Document

    Babbage

    PDF 2.97 MB