Bacalhau and Bacalhau Norte (formerly Carcara)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Oil production starts at Bacalhau
- Bacalhau FPSO arrives in Brazilian waters
- Development concept and phases
- Final investment decision (FID)
- Challenging full-cycle economics for Bacalhau Norte
- High-pressure reservoir presents challenges
- History
- Local content
- Unitisation
-
Gas
- Wells
- Oil
- Gas
- Operating costs
- Oil
- Gas
- Cash flow
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026
-
Production (2024-2033)Production Profile - BacalhauProduction Profile - Bacalhau NorteCapital Costs 2020 to 2029 (US$ million)Operating Costs 2025 to 2034 (US$ million)Index MapDetail mapCurrent participationCash Flow (US$)
- 15 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Intercampo Norte
Intercampo Norte was awarded in PDVSA's Third Round of Operating Service Agreements (Marginal Fields or OSAs). The round offered ...
$3,720Orca and Sul de Orca (formerly Gato do Mato)
Orca (formerly Gato do Mato) is a deepwater pre-salt oil and gas discovery located on block S-M-518 and the PSC block Sul de Orca.
$3,720Berling
Berling is a HP/HT gas and condensate field, located in the Norwegian Sea. It is being developed as a subsea tie-back to Asgard.
$3,720