Barossa Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
Emissions
- Safeguard Mechanism
- Reservoir CO2
- Reservoir CO2-linked costs
- Santos
-
Key development metrics
- Timing
- Wells
- BW Opal FPSO
- Subsea
- Contractors
- Exploration costs
- Capital costs
- Barossa
- 2 more item(s)...
-
Operating costs
- LNG offtake and upstream revenue
- Cash flow
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Reserves (2P) at 01/01/2026Production (2025-2034)Production ProfileOperating Costs 2025 to 2034 (US$ million)Capital Costs 2016 to 2025 (US$ million)Annual Gas PricesCash Flow (US$)PV Table (US$)
- 5 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Muradkhanli Contract Area
State-owned SOCAR currently operates the onshore Muradkhanli Contract Area, which contains three core oil fields: Muradkhanli, Jafarly ...
$3,720Dumbarton Area
The Dumbarton Area includes the mature Dumbarton, Lochranza and Balloch fields 220 kilometres northeast of Aberdeen.Dumbarton is a ...
$3,720El Tordillo Area
The El Tordillo Area comprises three separate licenses in the northeastern San Jorge Basin operated by Crown Point Energy: El Tordillo...
$3,720