Asset report

Barossa Area

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

We have assumed that the Barossa Area will be developed initially via seven subsea wells connected to an FPSO. The dry gas will then be piped 275 kilometres to a tie in point on the Bayu Undan export pipeline to Darwin LNG. A final investment decision on the Barossa Area is targeted for 2019 following which we anticipate production starting in 2023. The Barossa gas/condensate field is located in the Bonaparte Basin approximately 300 km north of Darwin. The ConocoPhillips operated Darwin ...

What's included

This report contains

  • Document

    Barossa Area

    PDF 4.31 MB

  • Document

    Barossa Area

    XLS 235.50 KB

  • Document

    Barossa Area

    ZIP 4.49 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Exploration
  • Reserves and resources
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 7 images and tables including:

Images

  • Index Map
  • Barossa Area Detail Map

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Indicative technical valuations

You may be interested in

Asset report

BassGas

Asset report

Browse LNG - upstream

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898