Asset Report

Bir El Msana (BMS)

From

$1,700.00

You can pay by card or invoice

From

$1,700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The BMS block is located in the south east region of Algeria, around 25 kilometres north of the El Borma- Mesdar oil pipeline (OD1). The BMS oil field was discovered on the block in 2003 and was appraised in 2005 with an ambitious step-out well to define the oil-water contact, which tested more water. It looked unlikely that the field would be developed until the BMS Deep well found oil in the Triassic TAG-I formation. Subsequently, the partners revised their view of the field following ...

What's included

This report contains

  • Document

    Bir El Msana (BMS)

    PDF 5.88 MB

  • Document

    Bir El Msana (BMS)

    XLS 606.50 KB

  • Document

    Bir El Msana (BMS)

    ZIP 6.38 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Well data
    • Exploration Activity
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Exploration Costs
    • Capital Costs
    • Operating Costs
    • Cost Recovery
    • Profit Petroleum
    • Taxes
    • Gas Rights
    • Windfall Profits Tax
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 22 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Commitments
  • Reserves and resources: Table 1
  • Production: Table 1
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Fiscal and regulatory: Table 1

Images

  • Index Map
  • Rhourde El Rouni (401c) Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

You may be interested in

Country Report

Algeria upstream summary

Asset Report

Bir Rebaa (403)

Asset Report

Bir Seba (416b/433a)

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800