Block 1
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
PSC
- Overview
- Initial PSC
- Operator
- Naming convention
-
Overview
- Structures
- Reservoirs
- Magtymguly
- Garagol-Deniz
- Diyarbekir
- Mashrykov and Ovez
-
Hydrocarbon quality
- Liquids
- Gas
- Soviet era
- 18 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index mapBlock 1 mapParticipation
-
Magtymguly reservoir qualityMagtymguly reservoir qualityGaragol-Deniz reservoir qualityDiyarbekir reservoir qualityDiyarbekir reservoir qualityReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Capital Costs Pre-2016 to 2024 (US$ million)Cash Flow (US$)
- 13 more item(s)...
What's included
This report contains:
Other reports you may be interested in
PM329
The PM329 block contains the Mesah, Piatu and East Piatu fields, located 200 kilometres offshore Terengganu in Peninsular Malaysia.
$3,720PM323
Newfield Exploration and Petronas Carigali were awarded the production sharing contract for Block PM323 on 15 June 2005.
$3,720Subsurface and Licensing in brief
Rolling coverage and analysis of key E&A activity, licensing, breakthrough technologies, and other subsurface events.
$1,300