Block 11-2 (Rong Doi)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Key Development Metrics
- Processing platform summary
- Wellhead platform summary
- Pipeline summary
- Supplier information (platforms and pipeline)
- Exploration Costs
- Cash Flow
- Gas Price
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- Block 11-2 Map
- Participation
- Reserves (2P) at 01/01/2026
- Contingent Resources (2C) at 01/01/2026
- Production (2015-2024)
- Production Profile
- Capital Costs Pre-2016 to 2024 (US$ million)
- Operating Costs 2024 to 2033 (US$ million)
- Annual Gas Prices
- Cash Flow (US$)
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Block 11/19 (Ceased)
Block 11/19 contains a unitised section of the Bozhong 25-1/25-1S and the Bozhong 19-4 heavy oil field.
$3,720Nam Con Son Pipeline
The Nam Con Son Pipeline is a two-phase pipeline running from Block 06-1 to the Phy My power and industrial complex in south Vietnam.
$2,580Block 09-1 (Bach Ho/Rong)
The Bach Ho and Rong fields are located in the Cuu Long Basin and are operated by the Vietnamese/Russian joint venture Vietsovpetro.
$3,720