Block 17 CLOV
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Emissions
-
CLOV main development
- CLOV Phase 1
- CLOV Phase 2
- CLOV Phase Two Plus
- CLOV Phase 3
- Exploration costs
- Capital costs
- Operating costs
- Cash flow
- Global Economic Model (GEM) File
- Cash Flow
- Indicative Technical Valuations
Tables and charts
This report includes the following images and tables:
-
Index mapBlock 17 CLOV mapParticipation
-
Field hydrocarbon and reservoir characteristicsKey wellsReserves (2P) at 01/01/2026Production (2015-2024)CLOV production profileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2025 to 2033 (US$ million)Cash Flow (US$)
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Block 17
Block 17 lies in the central Oriente basin and contains four fields. The most significant field, Hormiguero, came onstream in 1997...
$3,720Block 05-1a (Dai Hung)
The Dai Hung field is located in the Nam Con Son Basin, 270 kilometres southeast of Vung Tau and was brought onstream in October 1994.
$3,720Block 22 and NCMA-4 (LNG)
Block 22 lies to the northwest of Tobago and contains two gas discoveries: Cassra and Sancoche. Of the two discoveries, attention ...
$3,720