Asset report

Block G (Ceiba and Okume Complex)

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Block G fields are located offshore Equatorial Guinea and are operated by Kosmos Trident International Petroleum EG Inc, a 50:50 joint venture between Kosmos Energy and Trident Energy. Ceiba was discovered in 1999 with the first exploration well on the acreage. In a rapid development, that was a record at the time, first oil was achieved less than 14 months after discovery. The Okume Complex comprises the Oveng, Akom, Ebano and Elon fields. The first field from the Okume Complex, Elon, ...

What's included

This report contains

  • Document

    Block G (Ceiba and Okume Complex)

    PDF 4.67 MB

  • Document

    Block G (Ceiba and Okume Complex)

    XLS 1.02 MB

  • Document

    Block G (Ceiba and Okume Complex)

    ZIP 5.56 MB

Table of contents

Tables and charts

This report includes 38 images and tables including:

Images

  • Index Map
  • Ceiba and Okume Complex Map
  • Ceiba Production Profile
  • Okume Complex Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Geology: Table 2
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Exploration: Table 1
  • Ceiba Capital Costs
  • Costs: Table 2
  • Okume Complex Capital Costs
  • Costs: Table 4
  • Costs: Table 5
  • Ceiba
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Okume Complex
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Indicative technical valuations
  • Development: Table 1

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898