Block Z-1
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Full development delayed
- Exploration upside
- Community relations
- Historic
- Structure
- Reservoir
- Corvina
- Albacora
- Piedra Redonda and Delfin
- Gas to power project
- Capital costs
- Operating costs
- Cash flow
- 2 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026
-
Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)Split of Revenues
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Al Shaheen (Block 5)
Al Shaheen is Qatar's largest oil field and is located off the country's north coast, 80 kilometres north of Ras Laffan. The ...
$3,720Khazzan (Block 61)
Khazzan is a major tight gas project in central Oman. The field will produce a total of 1.5 bcfd gas at its peak.
$6,900Roystonea and other discoveries (Block 52)
Petronas and ExxonMobil have made three deepwater discoveries in Block 52: Sloanea (2020), Roystonea (2023) and Fusaea (2024). The ...
$3,720