Table of contents
- Summary
-
Key Issues
- Historical
- Arab D reservoir
- Arab C4 reservoir
- Uwainat reservoir
- Oil
- Gas
- Capital costs
- Operating costs
- Royalty
- Income Tax
- Depreciation
- Bonuses
- Cash flow
-
Cash Flow
- Bunduq
Tables and charts
This report includes the following images and tables:
-
Index mapDetail mapReserves (2P) at 01/01/2026
-
Contingent Resources (2C) at 01/01/2026Production (2015-2024)Bunduq (UAE) production profilePipeline summaryCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)ParticipationReservoir characteristics
- 7 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Bunduq - Qatar
The Bunduq oil field is located approximately 100 kilometres offshore Qatar, roughly halfway between the UAE's Daiyinah and Das ...
$3,720UAE other fields (sub-commercial)
Data on fields we currently classify as sub-commercial, and not part of existing concessions in the UAE are included in this report.
$3,720Kim Long Pipeline (Block B - O Mon)
The Kim Long to O Mon gas pipeline will supply sales gas from the "Block B" fields to power stations onshore southern Vietnam.
$2,580