Asset report

Camden

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Camden Coal Seam Gas (CSG) project is located 50 kilometres southwest of Sydney, New South Wales. Camden is operated by AGL and was the first commercial gas development in the Sydney Basin. To date, over 140 wells have been drilled in two phases of development. All the early wells were vertical holes, with dual completions in two seams. As the development progressed an increasing number of wells were drilled surface-to-in-seam (SIS).

What's included

This report contains

  • Document

    Camden

    PDF 6.78 MB

  • Document

    Camden

    XLS 562.00 KB

  • Document

    Camden

    ZIP 7.26 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Well data
  • Reserves and resources
  • Production
  • Infrastructure
    • Operating Costs
    • AGL Stage One Contract
    • AGL Stage Two Contract
    • AGL Combined Contract - November 2005
    • AGL Energy takeover of Sydney Gas
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Exchange rate
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 22 images and tables including:

Images

  • Index Map
  • Camden Gas Project Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Costs: Table 3
  • Sales contracts: Table 1

You may be interested in

Asset report

Minerva

Asset report

Basker Manta Gummy

Asset report

Beharra Springs Area

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898