Asset Report

Captain

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Captain is a large heavy oil field situated in the Outer Moray Firth, 145 kilometres northeast of Aberdeen. It is one of the most complex and capital-intensive oil projects on the UKCS. Captain was sanctioned in 1995 and first production was in 1997. Different areas of the field have been developed in phases. The field was initially developed with a wellhead protection platform (WPP) located in Area A of the field, tied-back to the Captain floating production storage and offloading (FPSO) ...

Table of contents

    • Enhanced Oil Recovery (EOR)
    • EOR has boosted reserves and production
    • Decarbonisation
    • Further upside potential from contingent resources
  • Main development
  • Drilling
    • Stage 1
    • Stage 2 Phase I
    • Stage 2 Phase II
    • Emissions
    • EOR phase 1
    • EOR phase 2
  • Decommissioning costs
    • Main field
    • EOR Phase 1
    • EOR Phase 2
  • Cash flow
  • Global Economic Model (GEM) file
  • Cash Flow
  • (US$ million)
  • 1 more item(s)...

Tables and charts

This report includes the following images and tables:

  • Capital Costs Pre-2016 to 2024 (£ million)
  • Capital Costs 2037 to 2040 (£ million)
  • Cash Flow (US$)
  • PV Table (US$)
  • Summary Table (US$)
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2026
  • Remaining Present Value Price Sensitivities
  • Cash Flow (Local Currency)
  • PV Table (Local Currency)
  • Summary Table (Local Currency)
  • 15 more item(s)...

What's included

This report contains:

  • Document

    Captain

    XLS 1.14 MB

  • Document

    Captain

    PDF 2.96 MB