Asset Report
Captain
Report summary
The Captain heavy oil field is situated in the Outer Moray Firth, 145 kilometres northeast of Aberdeen. The initial development utilised a manned wellhead production and drilling platform facility (WPP-A) tied back to an FPSO. The Captain Expansion Project involved the installation of a second wellhead platform (BLP-A), bridge-linked to WPP-A, in 2000. Horizontal wells of up to 1,800 metres in length with downhole pumps have been used to recover the viscous oil. Enhanced Oil Recovery (EOR) ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- EOR Stage 2 brought onstream
- Electrification could offer a decarbonisation solution
- Further upside potential from contingent resources
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
-
Production
- Emissions
-
Development
- Infill drilling
-
Enhanced Oil Recovery
- Stage 1
- Stage 2 Phase 1
- Stage 2 Phase 2
-
Platforms
- Captain Expansion Project
- Infrastructure
-
Costs
-
Capital costs
- Main field
- EOR phase 1
- EOR phase 2
-
Operating costs
- Emissions Trading Scheme (ETS)
- Main field
- EOR Phase 1
- EOR Phase 2
-
Capital costs
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Carbon price
- Exchange rate
- Fiscal terms
- Global Economic Model (GEM) file
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 29 images and tables including:
- Key facts: Table 1
- Index map
- Captain map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Captain production profile
- Cash flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Present Value Price Sensitivities
- Cash flow (£ million)
- Economic analysis: Table 5
- Economic analysis: Table 6
- Development: Table 1
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Decommissioning costs
- Costs: Table 6
- Costs: Table 7
- Costs: Table 8
What's included
This report contains: