Asset Report

Chouech Es Saida

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

14 November 2017

Chouech Es Saida

Report summary

The Chouech Es Saida oil field is located in southern Tunisia, adjacent to the Algerian border and approximately 60 kilometres south of the giant El Borma field. Serinus Energy operates the field. Production is treated onsite at the Chouech Es Saida Central Processing Facility (CPF) which has a processing capacity of 5,000 b/d of oil and 14 mmcfd of gas. The treated oil is transported to Eni's El Borma field via an 80-kilometre 6-inch oil pipeline, where it is tied into the In Amenas-La Skhira pipeline. The operator began producing gas in 2009 after laying an 80-kilometre 6-inch gas pipeline to the gas sales point at Eni's El Borma field. Gas is transported onwards to the Ghannouche terminal near Gabes. ETAP, the state oil company, maintains the right to back-in to the licence up to 50% when cumulative net sales exceed 6.5 million barrels. The licence expires in 2027, at which point the operator may apply to extend the contract.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Well data
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Exploration Costs
    • Capital Costs
    • Operating Costs
  • Sales contracts
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Domestic Oil Price
    • Gas price
    • Global Economic Model (GEM) File
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Detail Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Infrastructure: Table 1
  • Sales contracts: Table 1
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4

What's included

This report contains:

  • Document

    Chouech Es Saida

    PDF 5.10 MB

  • Document

    Chouech Es Saida

    XLS 613.00 KB

  • Document

    Chouech Es Saida

    ZIP 5.61 MB

Other reports you may be interested in

Browse reports by Industry Sector