Asset Report

Chouech Es Saida

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Chouech Es Saida oil field is located onshore in southern Tunisia, 60 kilometres south of the El Borma field. The field was brought onstream by Agip (now Eni) in 1977 and initially produced until 2000. Athanor took over the licence in 2001 and brought the field back onstream in 2003. Serinus Energy now operates the field. Production is treated onsite at the Chouech Es Saida Central Processing Facility (CPF). Treated oil is transported to Eni's El Borma field via an 80-kilometre ...

Table of contents

  • Summary
  • Key Issues
  • Emissions
  • Exploration costs
  • Capital costs
  • Operating costs
  • Cash flow
  • Global Economic Model (GEM) File
  • Cash Flow

Tables and charts

This report includes the following images and tables:

  • Index map
  • Detail map
  • Participation
  • Key E&A wells
  • Reserves (2P) at 01/01/2025
  • Contingent Resources (2C) at 01/01/2025
  • Production (2015-2024)
  • Production profile
  • Pipeline summary
  • Capital Costs Pre-2016 to 2024 (US$ million)
  • Operating Costs 2025 to 2029 (US$ million)
  • Annual gas prices
  • 6 more item(s)...

What's included

This report contains:

  • Document

    Chouech Es Saida

    PDF 2.09 MB