Corvinus project
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Key development metrics
- Gas price
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index mapCorvinus project mapParticipation
-
Hydrocarbon and reservoir qualityKey E&A wellsDiscovery summaryContingent Resources (2C) at 01/01/2026Reserves (2P) at 01/01/2026Production (2023-2024)Corvinus project production profileCash Flow (US$)PV Table (US$)
- 8 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Mina do Barroso - Lithium mine project
A detailed analysis of the Mina do Barroso lithium mineral project.
$2,250Timok copper mine project
A detailed analysis of the Timok copper-gold mine project.
$2,250Cleaver Bank High Project
The Cleaver Bank High Project comprises the Carrack and Cutter gas fields. The latter is tied back to Carrack, which is tied back ...
$3,720