Cruz de Lorena-Sierras Blancas-CASO
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Capital costs
- Operating costs
- Cash flow
- Cash Flow
- Cruz de Lorena-Sierras Blancas
- Coiron Amargo Sur Oeste
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026Production (2015-2024)Cruz de Lorena-Sierras BlancasCoiron Amargo Sur OesteCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Annual Gas Prices
- 12 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Pampa de Pongo iron ore mine
Pampa de Pongo is an iron ore mining project being developed in Peru which will produce a 66%-Fe concentrate product.
$2,250Atacama (Albemarle) - Lithium brine
A detailed analysis of the Atacama (Albemarle) lithium brine operation.
$2,250Pastos Grandes - Lithium brine project
A detailed analysis of the Pastos Grandes lithium brine project.
$2,250