Cruz de Lorena-Sierras Blancas-CASO
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Capital costs
- Operating costs
- Cash flow
- Cash Flow
- Cruz de Lorena-Sierras Blancas
- Coiron Amargo Sur Oeste
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026Production (2015-2024)Cruz de Lorena-Sierras BlancasCoiron Amargo Sur OesteCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Annual Gas Prices
- 12 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Dias D'Avila copper smelter
A detailed analysis of the Dias D'Avila copper smelter.
$2,250Volcan gold mine project
A detailed production and competitive analysis of the Volcan gold mine project.
$2,250La Coipa mine
A detailed analysis of the La Coipa gold mine.
$2,250