Asset Report

Doba Oil Project

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Seven fields collectively make up the Doba Oil Project, in southern Chad. The first discoveries, Kome and Miandoum, were made by Conoco in 1975. ExxonMobil acquired operatorship in the mid-1980s, and subsequent exploration has increased oil initially in place to over 3 billion barrels. A bespoke export solution was required given the small domestic demand and lack of infrastructure. Construction of the Chad-Cameroon Pipeline (CCP) started in 2000, and was completed in 2003. Heavy crude is ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Government nationalises Savannah's assets
      • Arresting production decline now at risk
      • High operating expenditure
      • Political instability
  • Location maps
    • ExxonMobil divestment
    • Government nationalises Savannah's assets
    • Historical participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • Facilities
    • Drilling
  • Infrastructure
    • Capital costs
    • Operating costs
    • Signature bonus
    • Crude oil valuation
    • Production bonus
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

  • Key facts: Table 1
  • Index map
  • Doba Oil Project map
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Infrastructure: Table 1
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining PV Price Sensitivities
  • Participation: Table 1
  • Participation: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Fiscal and regulatory: Table 1

What's included

This report contains:

  • Document

    Doba Oil Project

    PDF 5.58 MB