Dostlug (Azerbaijan)
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
-
Current status
- 2021 Azerbaijan-Turkmenistan MoU
- PSC in Turkmenistan (Buried Hill Energy)
-
Historical background
- Azerbaijan
- Turkmenistan
-
Current status
-
Geology
- Structure
- Reservoirs
-
Exploration
- Soviet era
-
PSC in Turkmenistan (Buried Hill Energy)
- Activity to date
- Work commitments
- Future E&A work
-
Reserves and resources
- Reported data
-
Modelling
- Overview
- In place volumes
- Resources
- Production
-
Development
- Overview
- Key development metrics (for full cross-border field)
-
Infrastructure
-
Oil
- Export route
- Offshore tie-in options
- Gas
-
Oil
-
Costs
- Capital costs
-
Operating costs
- Field costs
- Abandonment fund payments
- Transportation costs
-
Fiscal and regulatory
- Overview
- PSC in Turkmenistan
-
Economic assumptions
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Global Economic Model (GEM) file
-
Economic analysis
- Indicative valuations
Tables and charts
This report includes 7 images and tables including:
- Key facts: Table 1
- Index map
- Dostlug map
- Exploration: Table 1
- Geology: Table 1
- Economic analysis: Table 1
- Reserves and resources: Table 1
What's included
This report contains:
Other reports you may be interested in
01 March 2021
Dostlug (Turkmenistan)
Dostlug (Turkmenistan)
The offshore Dostlug oil and gas field has previously been disputed by Azerbaijan and Turkmenistan in the south Caspian Sea. In 2021, ...
$3,10001 March 2021
Azerbaijan other fields (sub-commercial)
Azerbaijan other fields (sub-commercial)
Data on the fields we currently classify as sub-commercial are available below. Sub-commercial fields contain hydrocarbon volumes that ...
$3,10015 July 2019
Azerbaijan product markets long-term outlook H1 2019
Azerbaijan product markets long-term outlook H1 2019
Wood Mackenzie's outlook for the fundamentals of the Azerbaijan oil products market.
$4,750