Dover (MC 612)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Cash Flow
Tables and charts
This report includes the following images and tables:
- Index Map
- Detail Map
- Participation
- Reserves (2P) at 01/01/2025
- Production (2026-2035)
- Production Profile
- Capital Costs 2023 to Post-2031 (US$ million)
- Operating Costs 2025 to 2033 (US$ million)
- Cash Flow (US$)
- PV Table (US$)
- Summary Table (US$)
- 4 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Appomattox
Appomattox (MC 392) is a large oil and gas discovery in the Jurassic-aged Norphlet aeolian sands. The field was discovered in December ...
$6,900Tubular Bells (MC 725)
Tubular Bells (MC 725) is a mid-sized, subsalt Miocene oil and gas field located in the southern portion of the Mississippi Canyon ...
$3,720Facility - Thunder Hawk FPU
The Thunder Hawk floating production unit began operating in July 2009 when the Thunder Hawk (MC 734) field achieved first production. ...
$2,580