Dumbarton Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Hub cessation imminent
- NEO Energy and Repsol Resources UK in strategic merger
- Dumbarton
- Lochranza
- Balloch
-
Capital costs
- Dumbarton
- Lochranza
- Balloch
- Decommissioning costs
-
Operating costs
- Dumbarton
- Balloch
- Lochranza
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
-
Cash flow (US$ million)
- Balloch
- Lochranza
- Dumbarton
Tables and charts
This report includes the following images and tables:
-
Capital Costs 2027 to 2030 (US$ million)Index mapDumbarton map
-
ParticipationField hydrocarbon characteristicsReserves (2P) at 01/01/2026Production (2015-2020)Production profilePlatform summaryPipeline summaryCapital Costs Pre-2015 to 2022 (US$ million)
- 26 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Sakhalin-1 Area
The Sakhalin-1 project is operated by Rosneft, in partnership with ONGC and a consortium of Japanese companies. The contract area ...
$5,280Contract 1 Area (Ceased)
The contract 1 Area, previously known as the Unocal 1 Contract Area, was the first offshore gas project in the Gulf of Thailand. ...
$3,720Quifa Area
The Quifa block is adjacent to and on trend with the giant Rubiales heavy oil field in the Llanos basin. Quifa is Frontera Energy's ...
$3,720