Dumbarton Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Hub cessation imminent
- NEO Energy and Repsol Resources UK in strategic merger
- Dumbarton
- Lochranza
- Balloch
-
Capital costs
- Dumbarton
- Lochranza
- Balloch
- Decommissioning costs
-
Operating costs
- Dumbarton
- Balloch
- Lochranza
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
-
Cash flow (US$ million)
- Balloch
- Lochranza
- Dumbarton
Tables and charts
This report includes the following images and tables:
-
Capital Costs 2027 to 2030 (US$ million)Index mapDumbarton map
-
ParticipationField hydrocarbon characteristicsReserves (2P) at 01/01/2026Production (2015-2020)Production profilePlatform summaryPipeline summaryCapital Costs Pre-2015 to 2022 (US$ million)
- 26 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Bleo Holm Area
The Bleo Holm Area includes the Blake and Ross fields. They lie in the Moray Firth Basin, 120 kilometres northeast of Aberdeen. Ross ...
$3,720Claymore Area
The Claymore Area lies in the outer Moray Firth, 25 kilometres west of Piper. It includes the Claymore, Claymore East and Scapa oil ...
$3,720Scott Area
The Scott Area includes the Scott, Telford Area and Rochelle fields which lie close to the Britannia field in the Central North Sea. ...
$3,720