El Furrial
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Operating costs
- Cash Flow
- Indicative Technical Valuations
Tables and charts
This report includes the following images and tables:
-
Index mapDetail mapParticipation
-
Hydrocarbon and reservoir qualityKey E&A wellsDiscovery summaryReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Production profilePipeline summaryCapital Costs Pre-2016 to 2024 (US$ million)
- 11 more item(s)...
What's included
This report contains:
Other reports you may be interested in
El Pachon copper mine
A detailed analysis of the El Pachón copper mine project.
$2,250Colquijirca (El Brocal) copper mine
A detailed cost competitive analysis of the Colquijirca (El Brocal) copper mine.
$2,250El Abra Mill copper mine project
A detailed analysis of the El Abra Mill copper mine project.
$2,250