Elgin Franklin Area
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Development of Isabella as a tie-back is unlikely
- Forties Pipeline System (FPS) for Elgin/Franklin area costs could soar
- Franklin
- Elgin
- West Franklin
- Glenelg
- Recent drilling
- Platforms
-
Development drilling
- Elgin/Franklin
- Capital costs
- Elgin
- Franklin
- West Franklin
- Glenelg
- Elgin decommissioning
- Franklin decommissioning
- West Franklin decommissioning
- 9 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Platform summaryPlatform summaryCapital Costs Pre-2017 to 2025 (US$ million)
-
Capital Costs Pre-2017 to 2025 (US$ million)Capital Costs Pre-2017 to 2025 (US$ million)Capital Costs Pre-2018 to 2026 (US$ million)Capital Costs 2016 to 2025 (US$ million)Capital Costs 2041 to 2047 (US$ million)Capital Costs 2041 to 2047 (US$ million)Capital Costs 2036 to 2041 (US$ million)Capital Costs 2041 to 2046 (US$ million)Operating Costs 2026 to 2035 (US$ million)
- 38 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Marlim and Voador Area
The giant Marlim oil field was developed as a high priority asset for Petrobras. It was the largest field in terms of reserves until ...
$3,720Turkmengaz other key fields
State-owned Turkmengaz is Turkmenistan's dominant onshore gas operator. Its fields are concentrated in the prolific Amu Darya basin ...
$3,720Noyelles-Godault zinc smelter
A detailed analysis of the Noyelles-Godault zinc smelter.
$2,250