ETAP (Shell)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
-
Key Issues
- Murlach (Skua) redevelopment to start up in H2 2025
- Contribution to ETAP (BP) decommissioning
- Egret
- Heron
- Skua
- Decommissioning costs
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
-
Cash flow (US$ million)
- Heron
- Egret
- Skua
Tables and charts
This report includes the following images and tables:
-
Capital Costs 2018 to 2023 (US$ million)Index mapETAP (Shell) map
-
Field participationField characteristicsEgretHeronSkuaReserves (2P) at 01/01/2026Main pipeline summaryCash Flow (US$)PV Table (US$)
- 19 more item(s)...
What's included
This report contains:
Other reports you may be interested in
ETAP (BP)
The Eastern Trough Area Project (ETAP) was established to develop several oil and gas accumulations which were unlikely to prove ...
$5,280PowerNap (MC 943)
PowerNap (MC 943) is a Shell-operated oil and gas discovery located in southern Mississippi Canyon, approximately 16 kilometres (10 ...
$3,720Elgin Franklin Area
The Elgin and Franklin Area includes the ultra high pressure-high temperature (uHP/HT) Elgin, Franklin, West Franklin and Glenelg ...
$6,900