Asset report

Front Runner

From

$1,700.00

Get this report

From

$1,700.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Front Runner area is located in the Green Canyon protraction area of the Central Gulf of Mexico and comprises three oil and gas fields: Front Runner North (GC 338) Front Runner South (GC 339) and Quatrain (GC 382). The Front Runner area has been developed via a dry tree truss spar production system located on block GC 338. Start up was initially expected in October 2004 but was delayed due to the passage of Hurricane Ivan pushing back first production until 4 December 2004. The ...

What's included

This report contains

  • Document

    Front Runner

    PDF 915.58 KB

  • Document

    Front Runner

    XLS 246.00 KB

  • Document

    Front Runner

    ZIP 1.07 MB

Table of contents

  • Key facts
  • Summary
  • Location maps
  • Production
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 14 images and tables including:

Images

  • Index Map
  • Field Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2017
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2017)
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Production: Table 1
  • Production: Table 2
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898