Frontera - Other Fields
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Frontera development plans for Colombia
- History
- Capital costs Cachicamo
- Capital costs Corcel Area
- Capital costs Cravoviejo
- Capital costs Guaduas
- Capital Costs Sabanero
- Operating costs Cachicamo
- Operating costs Corcel Area
- Operating costs Cravoviejo
- 4 more item(s)...
Tables and charts
This report includes the following images and tables:
- Map of Eastern Frontera blocks
- Map of Western Frontera blocks
- Participation
- Reserves (2P) at 01/01/2026
- Production (2015-2024)
- Cravoviejo Production Profile
- Cachicamo Production Profile
- Corcel Production Profile
- Guaduas Production Profile
- Sabanero Production Profile
- Capital Costs 2025 to Post-2033 (US$ million)
- 30 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Sergipe-Alagoas Basin - Other Fields
The Sergipe-Alagoas Basin - Other Fields are low priority assets for Petrobras due to their small sizes. Polo Carmópolis that ...
$3,720Ecopetrol - Other Fields
This analysis includes Ecopetrol's wholly-owned, small assets not covered in separate analyses. Most are operated by ...
$3,720Espirito Santo Basin - Other Fields
The Espírito Santo Basin - Other Fields are low priority assets for Petrobras due to their small sizes. The offshore assets, ...
$3,720 
         
         
         
         
         
         
     
     
     
     
     
     
     
     
    