Asset Report
G/14
Report summary
The G/14-A, B and C fields, together with the G/16a-A and G/17a-S1 fields, have all been tied back to the G/17d-AP processing platform. These fields make up the wider area development on the G/14, G/16 and G/17 blocks.The G/14-A and G/14-B fields have been developed using an unmanned satellite platform (G/14-A) located over the G/14-B field. The G/14-A field has been developed via an extended reach well drilled from the G/14-A platform. The G/14-B discovery well was re-completed as a ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- G/17d-AP platform
- Participation history
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
- Area development
- G/14-A and G/14-B
- G/14-C
- G/17d-AP platform
- Infrastructure
-
Costs
-
Capital Costs
- G/14-A&B Capital Costs
- G/14-C Capital Costs
-
Operating Costs
- G/14-A&B Operating Costs
- G/14-C Operating Costs
-
Capital Costs
- Sales contracts
- Fiscal and regulatory
-
Economic assumptions
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Exchange rate
- Fiscal Terms
- Global Economic Model (GEM) file
-
Economic analysis
- Cash Flow
Tables and charts
This report includes 39 images and tables including:
- Key facts: Table 1
- Index Map
- G/14-A, B & C Map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- G/14- A&B Production Profile
- G/14-C Production Profile
- Development: Table 1
- Cash Flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2019)
- Remaining PV Price Sensitivities
- Cash flow ( million)
- Economic analysis: Table 5
- Economic analysis: Table 6
- G/14-C Cash flow (US$ million)
- Economic analysis: Table 8
- Economic analysis: Table 9
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
- Remaining PV Price Sensitivities
- G/14-C Cash flow ( million)
- Economic analysis: Table 11
- Economic analysis: Table 12
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Costs: Table 4
- Costs: Table 5
- Costs: Table 6
What's included
This report contains:
Other reports you may be interested in
Country Report
Austria upstream summary
A mature producer, with output in decline - Austria currently produces around 20,000 boe/d, split almost evenly between liquids and ...
$3,400
Asset Report
Perama gold mine project
A detailed analysis of the Perama gold mine project.
$2,250
Asset Report
Turkmengaz minor fields
This report provides reserve and production data for commercial fields in Turkmenistan that are not currently modelled in a detailed ...
$3,100