Gassled-Åsgard Transportation System
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Norwegian State acquires ownership of the Gassled pipeline network
- Near-term capacity constraints risk timing of new projects
- Emissions reduction studies at Kårstø
- Location maps
- Participation
- Development
-
Throughput
-
Tariffs
- Gassled
-
Tariffs
-
Costs
- Capital Costs
- Operating Costs
- Fiscal and regulatory
- Economic assumptions
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- Asgard Transportation System map
- Participation: Table 1
- Throughput: Table 1
- Throughput: Table 2
- Gas throughput profile
What's included
This report contains:
Other reports you may be interested in
Gassled
Gassled is the unitised Norwegian gas export network.
$5,280Polarled
The Polarled pipeline project has been initiated to provide a transport solution for gas fields in a remote area of the Norwegian Sea.
$2,580Oseberg Transportation System (OTS)
The Oseberg Transportation System (OTS) was built to transfer oil from the Oseberg field to an onshore terminal located at Sture,.
$2,580