Gazli Area (Uzbekneftegaz)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
-
Upstream
- Core fields
- Other fields
- Gazli UGS
-
Historical production
- Gazli
- Other brownfields
-
Current and future production
- Greenfields
- First greenfield cluster
- Second greenfield cluster
- Uchkir booster compressor station (BCS)
- Uchkir LPG unit
- Garbi mini-BCS
- Previous investment projects
-
Gazli UGS
- Overview
- Capacity
- Cost
- Gas
-
Liquids
- Oil and condensate
Tables and charts
This report includes the following images and tables:
-
Index mapGazli Area mapUpstream participation
-
Reservoir qualityGas qualityLiquids qualityDiscovery summaryReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2016-2025)Gazli Area production profilePipeline summary
What's included
This report contains:
Other reports you may be interested in
Shurtan Area
State-owned Uzbekneftegaz (UNG) operates the Shurtan Area, which is centred on the giant, albeit mature, Shurtan gas field and related ...
$3,720Marlim and Voador Area
The giant Marlim oil field was developed as a high priority asset for Petrobras. It was the largest field in terms of reserves until ...
$3,720Gullfaks Area
The Gullfaks Area consists of a number of oil and gas fields located to the east of Statfjord.
$5,280