Report summary
The Granite Point field is located offshore, 30 kilometres north of Nikiski in the Cook Inlet. The field was discovered in 1965 by Mobil and was brought onstream in 1967. Granite Point is primarily an oil field, but it also produces some associated gas. Hilcorp Energy acquired the field from Chevron in 2012 and has begun to revitalise the field and increase production through a development programme of workovers, recompletions and sidetracks.
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
- Development
- Infrastructure
-
Costs
- Capital Costs
- Sales contracts
- Fiscal and regulatory
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 21 images and tables including:
- Key facts: Table 1
- Granite Point Index Map
- Granite Point Field Map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Production Profile
- Infrastructure: Table 1
- Cash Flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Present Value Price Sensitivities
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
What's included
This report contains:
Other reports you may be interested in
Asset Report
Crescent Point Saskatchewan
In September 2003, the amalgamation of two junior oil and gas companies, Crescent Energy and Tappit Resources led to the creation of ...
$3,100
Asset Report
Point McIntyre (Prudhoe Bay Unit)
The Point McIntyre field is located offshore in the northern Prudhoe Bay Unit. The field came onstream in 1993 and produces from the ...
$3,100
Asset Report
Pine Point zinc mine project
A detailed analysis of the Pine Point zinc mine project.
$2,250