Asset Report

Grondin Area Fields

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Grondin-Mandaros and Barbier Marine licences include four commercial fields: Barbier, Grondin, Mandaros and Gonelle. The Ayol Marine licence contains the small Ayol field. The fields are located in shallow waters, 65 to 90 kilometres south of Port Gentil.The producing fields are operated by Perenco Gabon. It acquired most of TotalEnergies EP Gabon's (formerly Total Gabon) assets in 2017. TotalEnergies EP Gabon retained a majority non-operated stake in the Grondin-Mandaros and ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • Grondin, Mandaros, Gonelle and Barbier
      • Facilities
      • Wells
      • Ayol
  • Infrastructure
  • Costs
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
    • Cash Flow

Tables and charts

This report includes 33 images and tables including:

  • Key facts: Table 1
  • Index map
  • Grondin-Mandaros and Barbier Marine and Ayol map
  • Participation: Table 1
  • Participation: Table 2
  • Geology: Table 1
  • Well data: Table 1
  • Grondin-Mandaros, Gonelle and Barbier
  • Ayol
  • Reserves and resources: Table 3
  • Production: Table 1
  • Production: Table 2
  • Grondin Area production profile
  • Ayol production profile
  • Infrastructure: Table 1
  • Capital costs
  • Costs: Table 2
  • Operating costs
  • Grondin-Mandaros and Barbier Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining Present Value Price Sensitivities
  • Ayol Cash Flow
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining PV Price Sensitivities

What's included

This report contains:

  • Document

    Grondin Area Fields

    PDF 5.40 MB