Asset Report

Gryphon Area

Get this report*

$3,720

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Gryphon Area is comprised of four fields: Gryphon, Maclure, Tullich and Ballindalloch. The grouping is located within the prolific Quadrant 9 in the UK Northern North Sea. Gryphon was discovered in 1985, Maclure in 1987, Tullich in 2001, and Ballindalloch in 2016.All fields were developed via the Gryphon FPSO, the first FPSO on the UK Continental Shelf (UKCS) at the time. First production was achieved from Gryphon in 1993, within 10 months of development approval. The field produced ...

Table of contents

    • Field development
    • Early cessation prompts legal challenge
    • Decommissioning
    • Decommissioning timeline and costs could be subject to change
    • Gryphon Area decommissioning liability
    • Decommissioning losses at Gryphon will generate PRT rebates
  • Plug and abandonment (P&A)
    • FPSO
    • Wells
    • Subsea
    • Pipelines
    • Gas blowdown project
    • Decommissioning costs
    • Decommissioning liability varies
    • Tax relief
    • Decommissioning security
    • OSPAR regulations

Tables and charts

This report includes the following images and tables:

    Reserves (2P) at 01/01/2026Gryphon ProductionMaclure production
    Tullich productionBallindalloch productionIndex MapGryphon MapParticipationFPSO summaryPipeline summaryDecommissioning costs (US$ million)

What's included

This report contains:

  • Document

    Gryphon Area

    XLS 2.73 MB