Asset Report

Hejre

Get this report*

$5,280

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Hejre is a High Pressure/High Temperature (HP/HT) oil and gas field, located in the west of the Danish Central Graben. The field was discovered by Phillips in 2001 and appraised in 2005. This is the first HP/HT development in Denmark. The challenging nature of the reservoir has delayed the project and required multiple amendments to the field development plan.DONG Energy (now Orsted), which became operator in 2007, made a concept selection in August 2010. The development was approved by the ...

Table of contents

Tables and charts

This report includes the following images and tables:

  • Key facts: Table 1
  • Index Map
  • Hejre map
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Hejre production profile
  • Infrastructure: Table 1
  • Capital Costs
  • Decommissioning costs
  • 13 more item(s)...

What's included

This report contains:

  • Document

    Hejre

    PDF 5.06 MB

  • Document

    Hejre

    XLS 881.00 KB