Asset Report
Jackdaw
Report summary
Jackdaw is a standalone, ultra high-pressure/high-temperature (uHP/HT) gas and condensate field located in the Central North Sea, around 10 kilometres to the northeast of the Jade field. The field was discovered in 2005 by ConocoPhillips but has remained undeveloped. In 2022, Shell sanctioned the development. We assume the field will be brought onstream in 2026.Shell, the operator, is developing Jackdaw through four of ten highly compartmentalised segments. The field will be developed with ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Project reaches FID in July 2022 following regulator approval
- Ultra High Pressure, High Temperature (uHP/HT) and supply chain challenges
- Infrastructure tie-in considerations could impact costs and start-up
- Decarbonisation - potential electrification of the Central North Sea
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
-
Development
- Key development metrics
- Infrastructure
-
Costs
- Operating costs
-
Fiscal and regulatory
- HP/HT Allowance
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Gas price
- Carbon price
- Exchange rate
- Fiscal terms
- Global Economic Model (GEM) file
-
Economic analysis
- Cash flow
Tables and charts
This report includes 23 images and tables including:
- Key facts: Table 1
- Index map
- Jackdaw map
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production profile
- Infrastructure: Table 1
- Capital costs
- Decommissioning costs
- Costs: Table 3
- Cash Flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining PV Price Sensitivities
- Cash Flow (£ million)
- Economic analysis: Table 5
- Economic analysis: Table 6
What's included
This report contains: