Asset Report

Jinzhou 9-3

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

26 January 2018

Jinzhou 9-3

Report summary

Jinzhou 9-3 is a medium-sized oil and gas field located in the Liao Dong Bay, in the northeastern section of the Bohai Bay. Field development was kicked started in 1993 but was subsequently put on-hold as oil price dropped and project economics became less attractive. The Jinzhou 9-3 project was resumed in 1997, after development plan was amended to reduced overall project costs. The field came onstream in December 1999, and was developed through three platforms.

Table of contents

Tables and charts

This report includes 23 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Jinzhou 9-3 Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Infrastructure: Table 1
  • Exploration Costs
  • Capital Costs
  • Costs: Table 3
  • Operating Costs
  • Fiscal and regulatory: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2019)
  • Remaining Present Value Price Sensitivities

What's included

This report contains:

  • Document

    Jinzhou 9-3

    PDF 7.23 MB

  • Document

    Jinzhou 9-3

    XLS 378.50 KB

  • Document

    Jinzhou 9-3

    ZIP 7.17 MB