Kashagan super-giant restarts on schedule
Report summary
Kashagan wells have been brought onstream for pre-commissioning. However, official production restart is scheduled for 23 October - following oil and gas treatment at the onshore processing facilities. We expect a fast ramp-up at Kashagan. However, Phase One production is limited by physical capacity at onshore and offshore facilities. The initial capacity of 370,000 b/d will be commissioned by end-2017. Within 18 months of restart, Kashagan will already be Kazakhstan's second largest liquids producer.
Table of contents
- Pre-commissioning is underway
- Phase One to reach initial capacity in 2017
- Positive cash flow at last
Tables and charts
This report includes 1 images and tables including:
- Kashagan Phase One oil production and capacity
What's included
This report contains:
Other reports you may be interested in
Asset Report
Bystrinskoe copper mine project
A detailed analysis of the Bystrinskoe copper mine project.
$2,250
Asset Report
Bystrinskoe gold mine project
A detailed analysis of the Bystrinskoe gold mine project.
$2,250
Asset Report
Kyzyl Tashtygskoe zinc mine
A detailed analysis of the Kyzyl Tashtygskoe zinc mine.
$2,250