Laminaria/Corallina (Ceased)
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Summary
- Key Issues
- Historic Participation
- Further Development
- Exploration Costs
- Capital Costs
- Abandonment costs
- Operating Costs
- PRRT
- Cash flow
- Global Economic Model (GEM) file
- Cash Flow
Tables and charts
This report includes the following images and tables:
-
Index MapLaminaria/Corallina Detail MapField Participation
-
Reserves (2P) at 01/01/2026Production (2015-2024)Production ProfileExploration Costs 1999 to 2007 (US$ million)Capital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2011 to 2019 (US$ million)Cash Flow (US$)PV Table (US$)
- 4 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Contract 3 Area (Ceased)
The Contract 3 Area was initially signed by Unocal in 1989 and covers a group of gas/condensate fields that have been developed on a ...
$3,720Contract 2 Area (Ceased)
The Contract 2 Area, previously known as the Unocal 2 Contract Area, covers a group of gas/condensate fields in the Gulf of Thailand, ...
$3,720Longtom (Ceased)
The Longtom field ceased production in 2015. Longtom is a gas condensate field located in the eastern Gippsland Basin.
$3,720