Asset Report

Lianzi (Congo)

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Block 14 K/A-IMI is a joint development area set up by the governments of Congo and Angola in 2003 to settle a border dispute covering part of Angola's Block 14 and the deepwater part of the Haute Mer licence in Congo.In 2004, Chevron discovered the Lianzi field. All reserves discovered on the block are split equally between the Angola PSC and Congo PSC contracts. This analysis covers the share of the Lianzi field which is governed by the Congo PSC terms. The other half of the field is ...

Table of contents

  • Summary
  • Key Issues
  • Emissions
  • Exploration costs
  • Capital costs
  • Operating costs
  • Cash flow
  • Global Economic Model (GEM) File
  • Cash Flow

Tables and charts

This report includes the following images and tables:

    Index mapBlock 14 K/A-IMI mapParticipation
    Field hydrocarbon characteristicsReserves (2P) at 01/01/2026Production (2015-2024)Block 14 K/A-IMI (Congo) production profilePipeline summaryCapital Costs Pre-2007 to 2015 (US$ million)Operating Costs 2024 to 2033 (US$ million)
  • 7 more item(s)...

What's included

This report contains:

  • Document

    Lianzi (Congo)

    PDF 3.36 MB