Asset report

Liverpool Bay

From

$1,700.00

Get this report

From

$1,700.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Liverpool Bay project consists of six fields: Douglas Douglas West Hamilton Hamilton East Hamilton North and Lennox. The Douglas oil field facility forms the main hub for the whole project and consists of three bridge linked platforms housing drilling processing and accommodation separately. The Lennox oil and gas field located 25 kilometres northeast of the main hub has been developed via a simple unmanned wellhead platform tied back to the Douglas platform. The Douglas West oil ...

What's included

This report contains

  • Document

    Liverpool Bay

    PDF 600.85 KB

  • Document

    Liverpool Bay

    XLS 972.50 KB

  • Document

    Liverpool Bay

    ZIP 1.41 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 31 images and tables including:

Images

  • Index Map
  • Liverpool Bay Area Map
  • Liverpool Bay Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2017
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Infrastructure: Table 1
  • Production: Table 1
  • Production: Table 2
  • Development: Table 1
  • Development: Table 2
  • Costs: Table 7
  • Sales contracts: Table 1
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Cash Flow (£ million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Lennox
  • Costs: Table 6

You may be interested in?

Asset report

Loma Negra Area

Asset report

El Trapial Area

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898