Report summary
Table of contents
- Summary
- Key Issues
- Vaca Muerta operators push drilling envelope with extended laterals and real-time optimization
- Transition from vertical to horizontal well development
- Multi-zone development
- Cost reductions and drilling optimization
- Historic
- Conventional resources
- Tight oil
- Unconventional exploration
- Wells
- Liquids
- 9 more item(s)...
Tables and charts
This report includes the following images and tables:
-
Index MapDetail MapParticipation
-
Field Hydrocarbon CharacteristicsReserves (2P) at 01/01/2026Production (2015-2024)Production ProfileCapital Costs Pre-2016 to 2024 (US$ million)Operating Costs 2024 to 2033 (US$ million)Market PricesCash Flow (US$)
- 6 more item(s)...
What's included
This report contains:
Other reports you may be interested in
La Calera
La Calera is Pluspetrol's first Vaca Muerta project. The block has an advantageous location close to Loma Campana and Fortin de ...
$3,720Enfield Area
The Enfield Area analysis includes the original Enfield Area development, and the newer Greater Enfield project.
$3,720Pyrenees Area
The Pyrenees Area includes a number of offshore heavy oil fields in the Exmouth sub-basin of the Carnarvon Basin.