Asset Report

Long Lake

Get this report

$3,100

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Long Lake bitumen recovery and upgrading project is situated 40 kilometres southeast of Fort McMurray in the Athabasca oil sands region of northeastern Alberta. Long Lake is the fourth major integrated oil sands project in Canada, and it achieved first bitumen production in Q1 2008. Other integrated oil sands projects are developed through mining, but Long Lake was the first Steam Assisted Gravity Drainage (SAGD) project in Alberta to include on-site upgrading facilities. Bitumen is ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
    • Extraction and Upgrading
    • Co-generation
    • Pilot and Phase 1
    • Kinosis
    • Long Lake Southwest
    • Future Plans
  • Infrastructure
    • Capital Expenditure
      • Phase I and Long Lake Southwest
      • Kinosis and Long Lake
      • Maintenance and Sustaining
      • Abandonment
    • Operating Costs
      • SAGD Fixed Field Cost
      • Steam Cost
      • Carbon Tax
      • Transportation Cost
      • Total Opex
  • Sales contracts
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas price
    • Exchange rate
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 20 images and tables including:

  • Key facts: Table 1
  • Long Lake Index Map
  • Long Lake Detail Map
  • Participation: Table 1
  • Geology: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Present Value Price Sensitivities
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

What's included

This report contains:

  • Document

    Long Lake

    PDF 2.19 MB

  • Document

    Long Lake

    XLS 619.00 KB