Asset Report

Marine XII

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Nene Marine was discovered in 2012. Subsequent appraisal wells in 2013 and 2014 were very successful, discovering extensions to the field and indicating a potentially huge pre-salt field in shallow water Congo. The Minsala Marine field was discovered in 2014, 12 kilometres from Nene Marine.

Table of contents

  • Summary
  • Key Issues
  • Emissions
  • Litchendjili (start-up in 2015)
    • Phase 1 (start-up in 2014)
    • Phase 2A (start-up in 2017)
    • Phase 2B (start-up in 2020)
    • Phase 3
    • Congo LNG project
    • Exploration costs
    • Capital costs
    • Domestic gas sales
    • LNG feedstock price
    • Updated terms for LNG
  • Cash flow
  • Global Economic Model (GEM) File
  • Cash Flow
  • Indicative Technical Valuations

Tables and charts

This report includes the following images and tables:

    Index mapMarine XII mapCurrent participation
    Field hydrocarbon and reservoir characteristicsKey wellsReserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2015-2024)Marine XII production profilePipeline summaryOperating Costs 2025 to 2033 (US$ million)Cash Flow (US$)
  • 12 more item(s)...

What's included

This report contains:

  • Document

    Marine XII

    PDF 3.67 MB