Asset Report

Marlim Leste Area

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Marlim Leste is a medium-sized, deepwater oil and gas field located to the east of the giant Marlim field. It is part of the Marlim cluster, which is also composed by Marlim, Voador and Marlim Sul fields. It was discovered in 1987, but remained undeveloped for 22 years as Petrobras concentrated on the larger deepwater fields in its portfolio.The field is being exploited using a floating production and offloading vessel (FPO) and a floating production storage and offloading vessel (FPSO). ...

Table of contents

  • Key facts
    • Summary
    • Key issues
      • Petrobras withdraws Marlim cluster from its divestment portfolio
      • ANP seeks renewed Campos basin output
      • Concession contract extended
  • Location maps
    • History
    • Local content
    • Hydrocarbon quality
  • Well data
    • Deeper discoveries
    • 4D Seismic
  • Reserves and resources
    • Oil
    • Gas
    • Module 1 (the shallower sandstone reserves)
    • Module 2 (the deep carbonate Jabuti reserves)
    • Module 3 (the pre-salt Tracajá reserves)
    • Oil
      • Campos Basin Oil Transportation and Processing Master Plan (PDET)
    • Gas
    • Exploration costs
    • Capital costs
    • Operating costs
      • Lease costs
      • Transportation costs
    • Oil
    • Gas
  • Fiscal and regulatory
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Detail Map
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Present Value Price Sensitivities
  • Geology: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Development: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Sales contracts: Table 1
  • Costs: Table 3

What's included

This report contains:

  • Document

    Marlim Leste Area

    PDF 5.04 MB