Asset Report

Muradkhanli Contract Area

Get this report

$3,100

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

State-owned SOCAR currently operates the onshore Muradkhanli Contract Area, which contains three core oil fields: Muradkhanli, Jafarly and Zardab. In 2020, London-listed Zenith Energy exited a production rehabilitation and exploration PSC that was signed in 2016.All the fields were discovered during the Soviet era, and Muradkhanli and Jafarly are mature. Current production is extremely low, at around 200 b/d. This is far below historical peaks.Previous investment in redevelopment focused on ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Current status
    • Historical participation
      • Zenith Energy PSC (2016-20)
      • Initial PSC (1998-2001)
    • Muradkhanli
      • Upper Cretaceous
      • Middle Eocene
      • Other reservoirs
    • Jafarly
    • Zardab
  • Well data
  • Exploration
    • Overview
    • Oil
      • Reported data
      • Modelling
      • Upside
    • Gas
    • Oil
      • Historical production
      • Future production
    • Overview
    • Historical activity
      • Pre-2016
      • Zenith Energy PSC (2016-2020)
  • Infrastructure
  • Costs
    • Status
    • PSC terms
      • Compensatory petroleum obligation
      • Cost oil
      • Profit oil
      • Profit tax
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 27 images and tables including:

  • Key facts: Table 1
  • Index map
  • Muradkhanli Contract Area map
  • Well data: Table 1
  • Exploration: Table 1
  • Infrastructure: Table 1
  • Capital costs
  • Costs: Table 2
  • Operating costs
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
  • Remaining PV Price Sensitivities
  • Geology: Table 2
  • Geology: Table 3
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Participation: Table 1
  • Geology: Table 1
  • Production: Table 1
  • Production: Table 2
  • Muradkhanli Contract Area production profile
  • Fiscal and regulatory: Table 1

What's included

This report contains:

  • Document

    Muradkhanli Contract Area

    PDF 7.73 MB

  • Document

    Muradkhanli Contract Area

    XLS 922.50 KB