Asset Report

Muradkhanli Contract Area

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

04 May 2018

Muradkhanli Contract Area

Report summary

The Muradkhanli Contract Area contains three oil fields: Muradkhanli, Jafarly and Zardab. The fields were discovered during the Soviet era. Since 2016, they have been operated under a rehabilitation PSC signed between Zenith Energy (Canada) and SOCAR.The Muradkhanli and Jafarly fields are mature, with current production far below historical peaks. The Zardab field has produced only minor volumes due to sand control problems. Redevelopment efforts will involve well workovers and ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Historical participation (pre-2016)
    • Zenith Energy PSC (2016 onwards)
    • Muradkhanli
      • Upper Cretaceous
      • Middle Eocene
    • Zardab
    • Jafarly
    • Historical E&A activity (pre-2016)
    • Zenith Energy PSC (2016 onwards)
    • Historical estimates
    • Current estimate
    • Historical production
    • Future production
    • SOCAR compensatory production
    • Key development metrics
    • Pre-1998
    • 1998-2000
    • 2001-2016
    • Zenith Energy PSC (2016 onwards)
  • Infrastructure
    • Capital costs
      • Historical costs
      • Zenith Energy PSC
    • Operating costs
  • Sales contracts
    • Compensatory Petroleum Obligation
    • Cost oil and gas
    • Profit oil and gas
    • Profit tax
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global economic model (GEM) file
  • Economic analysis

Tables and charts

This report includes 26 images and tables including:

  • Key facts: Table 1
  • Index map
  • Muradkhanli Contract Area map
  • Exploration: Table 1
  • Infrastructure: Table 1
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2019)
  • Remaining PV Price Sensitivities
  • Participation: Table 1
  • Geology: Table 2
  • Geology: Table 3
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Muradkhanli Contract Area production profile
  • Costs: Table 3
  • Fiscal and regulatory: Table 1
  • Geology: Table 1
  • Costs: Table 1
  • Costs: Table 2

What's included

This report contains:

  • Document

    Muradkhanli Contract Area

    PDF 8.70 MB

  • Document

    Muradkhanli Contract Area

    XLS 454.50 KB

  • Document

    Muradkhanli Contract Area

    ZIP 8.65 MB