Asset Report

M`Via

This report is currently unavailable

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The M'via field ceased production in 2018 and has been decommissioned. There are no current plans to develop the M'via field. As such, this asset report will no longer be updated. Kindly contact the analyst should you wish to discuss this project. For more information about producing assets in Cameroon, please refer to the Cameroon Upstream Summary. The M'Via field is located onshore, 60 kilometres north of Kribi. The field was discovered by Elf in the 1980s. In 2004, Perenco ...

Table of contents

  • Summary
    • Historical participation
  • Exploration Activity
  • Exploration costs
  • Abandonment costs
  • Capital costs
  • Operating costs
  • Cash flow
  • Cash Flow

Tables and charts

This report includes the following images and tables:

    Index mapM'Via mapParticipation
    Reserves (2P) at 01/01/2026Contingent Resources (2C) at 01/01/2026Production (2013-2018)Production profileCapital Costs 2012 to 2021 (US$ million)Operating Costs 2012 to 2021 (US$ million)Cash Flow (US$)PV Table (US$)Summary Table (US$)
  • 6 more item(s)...

What's included

This report contains:

  • Document

    M`Via

    PDF 3.92 MB